The remediation project consists of a 56No. apartments, including replacement of aluminium joinery, recladding, replacement of tiles, and other remedial works.
Achievements
- The Final Account for the above project has been certified in the amount of $108,334 (incl GST) less than the Final Claim
- We have achieved substantial savings on the client’s behalf during the course of the contract through meticulous evaluation and careful negotiation and agreement of variation claims and provisional sum expenditure.
- The aggregate total of reductions/savings achieved between the variation claims presented by the contractor during the course of the contract and the final agreed value of the variation claims is over $427,000 (excl GST) or $492,000 (incl GST)
Location
The property is located at 118 Gladstone road, Parnell, within walking distance from Auckland CBD.
Consultants
Project Management - Babbage Consultants Ltd
Quantity Surveying - Quantum® QS
Consent and Design Status
Completion - TBC
CCC - TBC
Programme
Construction Price $3.82m (excl. GST)
Client Reference
- Quantum would not only meet the rigid criteria expected but also employed the necessary resource experience and skills to satisfy an extremely demanding project
- Quantum’s performance during stage one was exemplary which in itself was a major factor as to why the end result was completed within budget and making the decision to award Quantum stage two a mere formality
- In the world of contracting this was a significant achievement. Quantum’s expertise to ensuring that all the costs were correctly captured with no surprises also played a major part
Area Schedule
Basement Level -3 ≈ 2,650m2
Basement Level -2 ≈ 2,650m2
Basement Level -1 ≈ 2,650m2
Ground Floor ≈ 1,120m2
First Floor ≈ 955m2
Second Floor ≈ 955m2
Third Floor ≈ 955m2
Fourth Floor ≈ 955m2
Fifth Floor ≈ 955m2
Total Floor Area ≈ 13,845m2